Novosti

Najnovije vijesti o električnim vozilima, infrastrukturi punjenja, regulativi i EV tržištu

Tesla starts Megapack 3 production with 28% more energy per unit
Infrastruktura

Tesla starts Megapack 3 production with 28% more energy per unit

Tesla has started building its next-generation Megapack 3 grid battery, with the first units rolling off the line at the company’s new Megafactory in Brookshire, Texas. The plant went from groundbreaking to production in 16 months and is designed to build 50 GWh of Megapack 3 a year. That’s the version Tesla says packs roughly 28% more energy into the same footprint as the Megapack it replaces.

Pročitaj vijest →Electrek
Juiced doubles down with 120-mile range e-bike on dual-battery Scrambler Hardtail
Tehnologija

Juiced doubles down with 120-mile range e-bike on dual-battery Scrambler Hardtail

When Juiced Bikes unveiled its new generation of Scrambler models earlier this summer, the company hinted that an even longer-range version was on the way. Now it’s here. Juiced has officially launched the dual-battery version of its Scrambler Hardtail, giving riders a claimed range of up to 120 miles (200 km) while keeping the same moped-style design that has made the Scrambler one of the company’s signature models – and the first model to relaunch the brand’s second act.

Pročitaj vijest →Electrek